WE Metalworks logo with manufacturing and surface finishing tagline
WE Metalworks logo with manufacturing and surface finishing tagline
QUALITY CONTROL

Quality Control for Custom Metal Parts

Certified quality management systems and drawing-based inspection for machined, formed, cast and surface-finished metal components, from incoming material review through final inspection and release.

CERTIFIED MANAGEMENT SYSTEMS Quality systems supporting
different OEM requirements
ISO 9001:2015 Quality Management
ISO 13485:2016 Medical Devices QMS
IATF 16949:2016 Automotive Quality
ISO 14001:2015 Environmental Management
QUALITY MANAGEMENT SYSTEMS

Certified Systems Supporting Different OEM Requirements

Our factory operates under certified quality and environmental management systems covering general manufacturing, medical-device quality requirements, automotive quality management and environmental management.

These management systems provide the framework for document control, process management, inspection, corrective action and continual improvement across custom metal manufacturing projects.

ISO 01

ISO 9001:2015

Quality Management System

Provides the general quality-management framework for controlled manufacturing processes, documentation, inspection, corrective action and continual improvement across custom metal projects.

SYSTEM FOCUS Process Control · Documentation · Inspection · Improvement
ISO 02

ISO 13485:2016

Medical Devices Quality Management System

Supports controlled quality-management practices for projects associated with medical-device manufacturing requirements, including documented processes, traceability and risk-based quality control.

SYSTEM FOCUS Controlled Processes · Records · Traceability · Quality Planning
IATF 03

IATF 16949:2016

Automotive Quality Management System

Supports automotive-oriented quality management with emphasis on process consistency, defect prevention, documented control and continual improvement for applicable automotive projects.

SYSTEM FOCUS Process Consistency · Defect Prevention · Control · Improvement
ISO 04

ISO 14001:2015

Environmental Management System

Provides a structured framework for managing environmental aspects, operational controls and continual environmental improvement across manufacturing and supporting processes.

SYSTEM FOCUS Environmental Control · Operations · Compliance · Improvement
CERTIFICATION SCOPE

Management-system certification applies at the factory and process level. Project-specific product, inspection, documentation and qualification requirements are reviewed separately according to the customer drawing, application and technical specification.

INCOMING MATERIAL & PRE-PRODUCTION REVIEW

Quality Control Begins Before Production Starts

Before manufacturing begins, the drawing, material specification, critical dimensions, surface requirements and inspection points are reviewed so the production route is aligned with the finished-part requirements.

Incoming material and available supporting documentation can also be checked against project requirements before material is released for machining, forming, casting or other manufacturing operations.

01 DRAWING CONTROL

Drawing & Revision Review

The current drawing revision, CAD model, dimensional requirements, notes and project specifications are reviewed before manufacturing instructions are released.

Revision · CAD Data · Notes · Critical Features
02 MATERIAL SPECIFICATION

Material Grade & Condition

Alloy, grade, temper, condition and other material requirements are checked against the drawing or customer specification where they affect manufacturing and finished-part performance.

Alloy · Grade · Temper · Condition
03 MATERIAL DOCUMENTATION

Incoming Material Documents

Material certificates, supplier information and other supporting records can be reviewed and retained where required by the customer or project quality plan.

Certificates · Supplier Records · Project Requirements
04 PROCESS PLANNING

Manufacturing Feasibility Review

Geometry, machining access, tolerances, datum relationships and process sequence are considered before the manufacturing route is finalized.

Geometry · Access · Datums · Process Sequence
05 SURFACE REQUIREMENTS

Finish & Appearance Requirements

Surface roughness, anodizing, plating, conversion treatment, masking, appearance areas and other finish requirements are reviewed before processing begins.

Roughness · Finish · Masking · Appearance Areas
06 INSPECTION PLANNING

Critical Feature Identification

Dimensions, fits, hole positions, threads, mating surfaces and other critical characteristics can be identified in advance so inspection is planned around the functional requirements of the part.

Dimensions · Fits · Threads · Interfaces · Inspection Points
PRE-PRODUCTION QUALITY PLANNING

The level of review is matched to the project. A straightforward part may require only basic material and dimensional confirmation, while a tightly toleranced or multi-process component may require additional drawing, material, finishing and inspection planning before production.

IN-PROCESS INSPECTION

Quality Checks During Manufacturing & Processing

Quality control continues throughout production rather than relying only on final inspection. First-piece verification, dimensional checks and process monitoring help identify deviations before they affect a larger production quantity.

Inspection frequency and control points are matched to the drawing, tolerance level, process route, production quantity and project-specific quality requirements.

01 FIRST-PIECE CONTROL

First Article Verification

Initial production parts can be checked against key drawing requirements before the manufacturing process continues into repeated production.

Dimensions · Features · Interfaces · Drawing Requirements
02 DIMENSIONAL CONTROL

Critical Dimension Checks

Critical dimensions, fits, bores, hole positions, thicknesses and other functional features can be checked during production at appropriate process stages.

Fits · Bores · Positions · Thickness · Critical Features
03 SETUP CONTROL

Setup & Datum Verification

Workholding, datum references, orientation and machining setup can be verified where they influence positional accuracy, repeatability or relationships between multiple features.

Datums · Workholding · Orientation · Feature Relationships
04 PROCESS STABILITY

Tool & Process Condition

Tool condition, machining consistency and process changes can be monitored where wear, setup variation or repeated operations may influence dimensional or surface results.

Tool Condition · Wear · Repeatability · Process Adjustment
05 INSPECTION RECORDS

In-Process Measurement Records

Inspection results and process checks can be recorded according to the project quality plan, sampling requirements or customer documentation needs.

Measurements · Sampling · Checkpoints · Project Records
06 NONCONFORMANCE CONTROL

Deviation Identification & Containment

When a dimensional or process deviation is identified, affected parts can be separated for review before additional production or downstream processing continues.

Identification · Segregation · Review · Corrective Action
PROCESS CONTROL DURING MANUFACTURING

In-process inspection is planned around the features most likely to affect finished-part function or downstream operations. Simple parts may require only a small number of checkpoints, while tightly toleranced or multi-operation components may require additional verification between manufacturing stages.

DIMENSIONAL & SURFACE INSPECTION

Precision Inspection Equipment

Inspection methods are selected according to part geometry, tolerance level, functional features and surface requirements. Different measuring equipment is used to verify both complex geometric relationships and routine production dimensions.

From coordinate measurement and optical inspection to direct dimensional gauging and surface roughness measurement, inspection is matched to the characteristics defined on the drawing.

CMM inspection of a machined aluminum housing at WE METALWORKS quality control station 01
COMPLEX GEOMETRY

Coordinate Measuring Machine (CMM)

Used for dimensional and geometric verification of complex machined components where feature relationships, positions and datum references require coordinated measurement.

Position · Profile · Datums · Complex Geometry
Video measuring system inspection of a machined metal part for dimensional quality control 02
OPTICAL INSPECTION

Video Measuring System

Optical measurement supports non-contact inspection of profiles, edges, hole locations and smaller geometric features that are suitable for image-based dimensional verification.

Profiles · Edges · Hole Position · Small Features
Electronic height gauge dimensional inspection on a granite surface plate for machined metal parts 03
HEIGHT & DATUM CHECKS

Electronic Height Gauge

Used on a reference surface for checking heights, steps, feature positions and comparative dimensions relative to established datum surfaces.

Heights · Steps · Datum Reference · Feature Position
Outside micrometer measuring a machined metal component during precision dimensional inspection 04
PRECISION SIZE CONTROL

Outside Micrometer

Used for precise direct measurement of outside diameters, thicknesses and other accessible dimensions where tighter dimensional verification is required.

Diameter · Thickness · Width · Precision Measurement
Digital caliper used for dimensional inspection of precision machined metal components 05
GENERAL DIMENSIONAL CHECK

Digital Caliper

Used for routine dimensional inspection of external sizes, internal dimensions, depths and other accessible production features during manufacturing and final checks.

Outside · Inside · Depth · Routine Production Checks
Surface roughness tester measuring a machined metal part during quality control inspection 06
SURFACE VERIFICATION

Surface Roughness Tester

Used to verify specified surface roughness where machined finishes, sealing areas, sliding surfaces or other functional interfaces require defined surface conditions.

Ra · Surface Texture · Contact Areas · Functional Surfaces
INSPECTION MATCHED TO THE DRAWING

Measurement equipment is selected according to the feature, tolerance and inspection objective. Complex geometry may require coordinate or optical measurement, while routine dimensions and surface requirements can be verified with dedicated dimensional and surface inspection instruments.

FINAL INSPECTION & RELEASE

Final Verification Before Shipment

Before finished parts are released for packing and shipment, inspection is completed against the current drawing, project specification and agreed quality requirements.

Final verification can include dimensional checks, surface inspection, functional features and project-specific records so the shipment reflects the confirmed manufacturing requirements.

01 DRAWING REVIEW

Final Drawing Confirmation

The inspection basis is checked against the current drawing revision, technical notes and confirmed project requirements before final release.

Drawing Revision · Specifications · Notes · Project Requirements
02 DIMENSIONAL VERIFICATION

Final Dimensional Inspection

Critical dimensions, tolerances, positions and other specified features are verified according to the inspection plan and finished part requirements.

Dimensions · Tolerances · Position · Critical Features
03 SURFACE CONTROL

Surface & Appearance Inspection

Finished surfaces are reviewed for specified treatment, appearance, masking boundaries, visible defects and handling condition before packing.

Finish · Appearance · Masking · Surface Condition
04 FUNCTIONAL FEATURES

Interfaces & Assembly Features

Threads, holes, mating areas and other functional interfaces can be checked where they affect assembly, installation or connection with adjacent components.

Threads · Holes · Mating Areas · Assembly Interfaces
05 QUALITY RECORDS

Inspection Documentation

Measurement records, material documents and other project-specific inspection information can be prepared or retained according to the agreed quality requirements.

Inspection Records · Material Documents · Project Documentation
06 RELEASE & PACKING

Release for Packing & Shipment

Parts are released after required inspection steps are completed, then protected and packed according to part geometry, finish and transportation requirements.

Inspection Release · Protection · Packing · Shipment
RELEASE BASED ON PROJECT REQUIREMENTS

Final inspection scope is matched to the part and customer requirement. Routine components may use defined production checks and sampling, while tighter-tolerance or documentation-controlled projects can use additional final verification and inspection records before release.

DOCUMENTATION & TRACEABILITY

Project Records Supporting Quality & Traceability

Quality documentation is organized around the drawing, material, manufacturing route, inspection requirements and finished-part release criteria defined for each project.

The level of traceability and documentation can be matched to the customer requirement, from standard production records to more detailed material, inspection and process documentation.

01 DRAWING CONTROL

Drawing & Revision Records

Project records can be linked to the applicable drawing revision, CAD data and technical requirements used for manufacturing and inspection.

Drawing Revision · CAD Data · Technical Notes · Change Control
02 MATERIAL RECORDS

Material Documentation

Material certificates, supplier information and related supporting records can be retained where material verification or project traceability is required.

Material Grade · Certificates · Supplier Records · Lot Information
03 INSPECTION RECORDS

Dimensional Inspection Records

Measurement results and inspection records can be maintained according to the agreed inspection plan, sampling method and customer documentation requirements.

Dimensions · Sampling · Inspection Results · Release Records
04 PROCESS DOCUMENTATION

Manufacturing & Finish Records

Applicable manufacturing and surface-treatment information can be associated with the project where process confirmation or downstream traceability is required.

Manufacturing Route · Surface Treatment · Process Records
05 PROJECT IDENTIFICATION

Lot & Project Traceability

Parts and supporting records can be identified by project, order, lot or other agreed reference so relevant manufacturing and quality information can be traced when required.

Project · Order · Lot · Part Reference · Documentation Link
06 RECORD RETENTION

Quality Record Retention

Relevant project and quality records can be retained according to internal procedures and agreed customer requirements for future reference and repeat production.

Project Files · Quality Records · Repeat Orders · Reference Data
DOCUMENTATION MATCHED TO PROJECT REQUIREMENTS

Documentation scope depends on the project. Standard commercial parts may require only routine production and inspection records, while medical, automotive, aerospace or other controlled applications may require additional material, inspection, revision and process documentation defined before production.

SURFACE FINISHING QUALITY CONTROL

Quality Control Through Surface Finishing

Surface treatment is treated as part of the finished-component quality requirement rather than as a separate cosmetic step. Drawing notes, functional surfaces, masking areas and appearance requirements are reviewed before finishing begins.

After anodizing, electroplating, conversion coating, PVD or other specified treatments, relevant dimensions, interfaces and surface condition can be verified again before final release.

01 PRE-FINISH REVIEW

Finish Specification Review

The required treatment, drawing notes, surface designation and functional requirements are reviewed before parts are released for surface finishing.

Finish Type · Drawing Notes · Surface Areas · Project Requirements
02 MASKING CONTROL

Masking & Critical Areas

Threads, electrical contact areas, mating surfaces, precision fits and other protected zones can be identified before finishing where coating or treatment is not permitted.

Threads · Fits · Contact Areas · Mating Surfaces · Masking
03 PROCESS REQUIREMENTS

Treatment Requirement Control

Applicable process requirements such as finish type, color, specified coating condition and other customer-defined parameters are matched to the project specification.

Process Type · Color · Coating Requirement · Specification
04 APPEARANCE CONTROL

Surface Appearance Inspection

Visible surfaces can be reviewed for treatment consistency, color uniformity, handling marks, exposed areas and other appearance requirements defined for the finished part.

Appearance · Color · Coverage · Handling Marks · Surface Condition
05 POST-FINISH VERIFICATION

Dimensions After Finishing

Critical dimensions, fits, threads and assembly interfaces can be rechecked after surface treatment where the finished condition influences dimensional or functional requirements.

Dimensions · Fits · Threads · Interfaces · Finished Condition
06 FINAL RELEASE

Finished Surface Release

Surface-treated parts are released after the applicable appearance, dimensional and project-specific requirements have been reviewed against the confirmed finished-part specification.

Final Condition · Inspection · Documentation · Release
MACHINING + SURFACE FINISHING AS ONE QUALITY ROUTE

When machining and surface finishing are supplied as an integrated project, quality control follows the component through both stages. Critical dimensions, masking areas and functional interfaces can be planned before finishing and verified again in the final treated condition before shipment.

START YOUR PROJECT

Discuss Quality Requirements for Your Metal Parts

Send us your drawing, CAD file, material specification, tolerance, surface finishing and inspection requirements. Our team will review the manufacturing route and quality-control needs before quotation.